"<" back one image
forward one image ">"
dan-loop-5 
 The Ladysbridge Loop in East Cork. The newely constructed walkway was washed away in Storm Babet along with local roads which are expected to cost in the region of €50 million. Picture Dan Linehan
dan-loop-5 
 The Ladysbridge Loop in East Cork. The newely constructed walkway was washed away in Storm Babet along with local roads which are expected to cost in the region of €50 million. Picture Dan Linehan
© Examiner Publications (Cork) Ltd
The Ladysbridge Loop in East Cork. The newely constructed walkway was washed away in Storm Babet along with local roads which are expected to cost in the region of €50 million. Picture Dan Linehan