Collections > 2023 Photos > April 2023 > LC-bridge-08
Martin and Aine Doyle
"<" back one image
forward one image ">"
LC-bridge-08 
 Cork's newest bridge (yet to be named) was lifted into position just after midnight on the morning of Friday 21st April 2023. The pedestrian/cycle bridge will link Tramore Valley Park with Frankfield/Grange and crosses the N40 South Link Road. East Cork Crane Hire Ltd had the task of lifting the bridge for Jons Civil Engineering. Pic: Larry Cummins
LC-bridge-08 
 Cork's newest bridge (yet to be named) was lifted into position just after midnight on the morning of Friday 21st April 2023. The pedestrian/cycle bridge will link Tramore Valley Park with Frankfield/Grange and crosses the N40 South Link Road. East Cork Crane Hire Ltd had the task of lifting the bridge for Jons Civil Engineering. Pic: Larry Cummins
© Examiner Publications (Cork) Ltd
Cork's newest bridge (yet to be named) was lifted into position just after midnight on the morning of Friday 21st April 2023. The pedestrian/cycle bridge will link Tramore Valley Park with Frankfield/Grange and crosses the N40 South Link Road. East Cork Crane Hire Ltd had the task of lifting the bridge for Jons Civil Engineering. Pic: Larry Cummins